Monday, October 31, 2005

So empty it echoes

friggen roll cage - did you know that it takes one bloke 3.5 hours armed with an angle grinder a hacksaw and a big hammer to remove one fiat 128 roll cage - and not completely f*%k the rest o the car.....? and its not and easy 3.5 hours either - its hot - dirty - smoky - loud and generally antisocial. In fact it sucks.
 
but the cage is out - the rear section was 48mm steam pipe and must weigh about 30 kg plus on its own - to big too heavy and really ugly - the front section weighed less than half that and it had more tubes.... removing the cage also meant a few wee welds on the right rear wheel tub went ping - so a bit of welding is in order... see below
 
now for the bad news - due to the fact the new house needs a new kitchen - and that needs $$$ the car budget has been frozen while management decides *when* we can logically chuck 2.2k at the 128 for a jungle gym... but that just means I get to drag the thing into the new shed at home base and sort out all the inside mods that I was going to do after the cage went - plus a few I just thought up - since its going to be easier now to do that. so basically the list looks like this:
  • make transport frame
  • Pedal box and drivers floor area - new panel
  • Exhaust tunnel (rear passengers floor area) - new panel (and if you have been keeping up that leaves the front passengers foot well and a tee shape in the middle of the car as the only Fiat floor left!)
  • windscreen pillar - finish off nasty little patch
  • various cracks - weld
  • remove all extraneous bolts and brackets - more sparks
  • patch firewall - brake booster hole etc etc
  • tidy parcel tray remains - (did I mention I cut that out as well?)
  • fuel cell frame
  • beat out rear towers for shocks
  • tidy engine bay and boot
  • new front strut mounting plates
  • Finish the seam welding in couple of hard to reach places
  • wire brush underside and arches - seam seal and underseal including wheel arches
  • prep for paint - and prime/seam seal etc
  • paint interior and inside roof
  • fabricate a throttle pedal
plus a bunch of stuff I haven't thought of but not much that costs real money.... i.e. a good few weeks of solid work - so say about 5 months at warwick speed?
 
later
 
w
 
 

No comments: